EWP Hangers

Heavy-Duty Fire Wall Hangers

FWHH

Reference Series: -- --
The MiTek FWHH Heavy-Duty Fire Wall Hanger is designed to support beams and purlins at header locations. The higher capacity of the FWHH is achieved through top flange bearing along with added face and beam/purlin nailing. As with the FWH hanger, the advanced design allows you to install the hangers before the drywall is attached, allowing your project to be completely framed-up and weather-tight before the drywall sheathing shows up on site.

2 Hour Fire Rating: FWH hangers are tested per ASTM E814 standards. When installed on one side of a maximum 2 hour fire-rated wall assembly, the penetration of the MiTek FWH Fire Wall Hanger through the gypsum wallboard will not reduce the fire resistive rating of the 2 hour fire resistive assembly.

Patents: U.S. Patent No. 11,649,626
Materials: 12 gauge
Finish: Primer
Code Reports: View Code Report Table

Installation

  • Install the FWHH hanger flanges tight to the face of the header.
  • A minimum 2-ply 2×10 header is required for proper installation.
  • The beam/purlin should bear fully on the FWHH seat with a gap no greater than 1/8″ between the end of the supported member and the hanger.
  • Gypsum Wallboard Installation – Use the FWH-T template to slot cut the gypsum wallboard. See FWH-T Template Sequence. Slide the gypsum wallboard into position and fasten to the framing members meeting the minimum requirements specified by code.

Need Help or Have a Question? Contact Customer Service or Call 800-328-5934

Option Details:

Welded Top Flange Installation

Welded Top Flange Installation View / Download the above load table as a PDF