Caps and Bases
Wet Post Anchors
WAS / WE
Reference Series: PB, PBS
WAS – A formed base providing a 1" stand-off with high bearing capacity.
WE – A formed, one-piece design. Includes embossing for additional lateral strength.
WE – A formed, one-piece design. Includes embossing for additional lateral strength.
Materials: See Load Table
Finish: G90 galvanizing
Code Reports:
View Code Report Table
Technical Bulletins
Installation
- Use all specified fasteners.
- Insert into wet concrete after the pour. For the WE, embed the anchor so that the base plate is flush with the surface of the concrete. For the WAS, embed the anchor until the concrete surface meets the bottom edge of the stand off base legs. This will provide a 1″ stand-off where required.
- Not recommended for fence posts or other unrestrained (not fixed or fastened at top) applications. These anchors are not designed to resist overturning (moment) loads.
- Reference IRC R317.1.4, IBC 2304.12.2.2, IRC R407.3, IBC 2304.10.7
Need Help or Have a Question? Contact Customer Service or Call 800-328-5934
WAS Wet Post Anchor
Option Details:
Corrosion Resistant Products Table
View / Download the above load table as a PDFCode Report Table
WAS44-HDG
WAS66-HDG
No Code Listing
WE44-HDG
No Code Listing
No Code Listing